Commercial building solar panels in Camborne
An office or store in Camborne buys most of its electricity between eight in the morning and six at night, which is when a roof array generates. We check the covering and the lease together, because a roof with eight years of membrane left and a tenant with a break in three changes the answer.
921 kWh per kWp a year at this latitude, so a 210 kWp array models at about 193,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in CamborneIllustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.
- 20,450
- people in the Camborne built-up area (ONS Census 2021)
- 2,980
- office properties on the rating list in Cornwall (VOA, March 2025)
- 5,750
- retail properties, 160 of them large-format (VOA, March 2025)
- 0
- named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Solar for offices and retail across Cornwall
How much sun a Camborne roof gets
Modelled irradiation here is 1,172 kWh per square metre a year on a low-tilt array, which works out at 921 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 4 percent above the mean across the towns we cover.
The rating list for Cornwall
The Valuation Office Agency's rating list puts 2,980 office and 5,750 retail properties in Cornwall, covering about 334,000 and 1,048,000 square metres of floorspace respectively. By office stock the district sits in the top tenth of the 318 districts in England and Wales; by retail stock it sits in the top tenth of the 318 districts in England and Wales.
The big roofs are in the 160 large-format retail units, superstores and retail warehouses in the district, about 418,000 square metres of floorspace under largely single storey roofs.
The same list carries 1,890 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.
Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
The built-up area holds about 20,450 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).
We arrange surveys across the TR postcode area, starting from TR14.
Camborne ranks 8 of 8 towns we cover in Cornwall on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 921 to 979, a spread of 58 kWh per kWp. On a 210 kWp commercial roof that is about 12,180 kWh a year between the strongest and weakest town in the county.
Grid connection through National Grid Electricity Distribution
Connections around Camborne are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.
Across Cornwall the planning database records 174 solar schemes totalling 1116 MW, of which 88 are operational (REPD Q1 2026).
All solar on record near TR14
Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Copper Bottom Solar Farm Ground-Mounted Solar PV Array | Aura Power Storage Solutions | 30 MW | Ground | Awaiting Construction |
| Tolvaddon Business Park, Pool - Solar Array | Undercover Group | 0.43 MW | Ground | Awaiting Construction |
Send us the postcode
Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Camborne
- Is there enough sun in Camborne for a commercial roof array?
- Modelled at 921 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 193,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission for solar on a commercial building in Cornwall?
- Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Cornwall for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
- Does solar help a Camborne landlord meet MEES?
- It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
- Which network operator handles the connection in Camborne?
- Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.