solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Braintree

For a landlord in Braintree, a roof array is increasingly a question about the EPC rating as much as the electricity bill. Each survey records the usable area once edge strips, plant and walkways are taken out, the load the deck can take, and whether the lease lets the occupier alter the roof.

932 kWh per kWp a year at this latitude, so a 210 kWp array models at about 196,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Braintree
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Braintree commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 196,000 kWh/yr
Scale 1:400 / Rev A / CM7

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

43,190
people in the Braintree built-up area (ONS Census 2021)
880
office properties on the rating list in Braintree (VOA, March 2025)
1,020
retail properties, 40 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Offices and a retail park on the edge of a town in the east of England, several roofs carrying solar
Commercial stock of the kind we survey across East of England. Generated illustration, not a named site.

Solar for offices and retail across Essex

How much sun a Braintree roof gets

Modelled irradiation here is 1,191 kWh per square metre a year on a low-tilt array, which works out at 932 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 5 percent above the mean across the towns we cover.

The rating list for Braintree

The Valuation Office Agency's rating list puts 880 office and 1,020 retail properties in Braintree, covering about 117,000 and 187,000 square metres of floorspace respectively. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.

40 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 63,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 270 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 43,190 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across CM postcodes, CM7 outward.

FIG. 1 What a Braintree roof makes, month by month

What a Braintree roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 40 kWh per kWpFebMar: 75 kWh per kWpMarApr: 109 kWh per kWpAprMay: 125 kWh per kWpMayJun: 128 kWh per kWpJun128 kWh Jul: 128 kWh per kWpJulAug: 109 kWh per kWpAugSep: 86 kWh per kWpSepOct: 54 kWh per kWpOctNov: 32 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.8 times what Dec does on the same roof. A 210 kWp array here models at about 196,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan255,250
Feb408,400
Mar7515,750
Apr10922,890
May12526,250
Jun12826,880
Jul12826,880
Aug10922,890
Sep8618,060
Oct5411,340
Nov326,720
Dec224,620
Source: EU PVGIS v5.2
FIG. 2 Braintree against the rest of Essex
  • Colchester953
  • Canvey Island945
  • Southend-on-Sea942
  • Basildon933
  • Braintree932
  • Chelmsford930
  • Grays927
  • Brentwood913
  • Harlow908

Braintree ranks 6 of 10 towns we cover in Essex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 908 to 973, a spread of 65 kWh per kWp. On a 210 kWp commercial roof that is about 13,650 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

All solar on record near CM7

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Land west of Hawkspur Green (Hill Hall Solar) Lightsource Renewable Energy 4.9 MW Ground Operational
Four Elms Solar Array F H Nash Limited 0.17 MW Ground Operational
Four Elms, Bardfield Road - Solar Array F H Nash Limited 0.35 MW Ground Awaiting Construction
Antislip Antiwear Treads International, Swinbourne Drive - Solar Panels AATI Limited 0.15 MW Roof Awaiting Construction

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Essex, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Essex the planning database records 221 solar schemes totalling 2787 MW, of which 46 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Braintree

How much would solar on a commercial building in Braintree generate?
The model gives 932 kWh for every kWp installed here, so 210 kWp is about 196,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Braintree office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Braintree for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Braintree?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Braintree have capacity for export?
UK Power Networks is the distribution network operator for Essex. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.

Nearby