Commercial building solar panels in Canary Wharf

Commercial roofs in Canary Wharf tend to be flat, membrane covered and cluttered with plant, which shapes the layout more than the size does. We check the covering and the lease together, because a roof with eight years of membrane left and a tenant with a break in three changes the answer.

Book a roof survey in Canary Wharf
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Canary Wharf commercial roof
Roof 60 x 32 m, 1,920 m²
Array 209 kWp, east-west
Yield 188,000 kWh/yr
Scale 1:400 / Rev A / Greater London

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Aerial view of an out-of-town retail park where some of the large unit roofs carry solar arrays and others are bare
Commercial stock of the kind we survey across Greater London. Generated illustration, not a named site.

Commercial rooftop solar across Greater London

FIG. 1 What a Canary Wharf roof makes, month by month
Source: EU PVGIS v5.2
FIG. 2 Canary Wharf against the rest of Greater London
  • Kingston987
  • Tower Hamlets976
  • Bexley916
  • Woolwich912
  • Fulham910
  • Hammersmith910
  • Hounslow910
  • Richmond910
  • Barking909

Canary Wharf ranks 0 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 210 kWp commercial roof that is about 29,400 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

Connections around Canary Wharf are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Canary Wharf

Do we need planning permission for solar on a commercial building in Greater London?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Greater London for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Which network operator handles the connection in Canary Wharf?
Capacity varies street by street and only UK Power Networks can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.