Commercial building solar panels in Fareham

Whether solar pays on a Fareham commercial building depends less on the panels than on who owns the roof and who pays the bill. Each survey records the usable area once edge strips, plant and walkways are taken out, the load the deck can take, and whether the lease lets the occupier alter the roof.

980 kWh per kWp a year at this latitude, so a 210 kWp array models at about 206,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Fareham
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Fareham commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 206,000 kWh/yr
Scale 1:400 / Rev A / PO14

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

42,625
people in the Fareham built-up area (ONS Census 2021)
720
office properties on the rating list in Fareham (VOA, March 2025)
680
retail properties, 40 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Home Counties town, offices and a retail park with solar on several roofs
Commercial stock of the kind we survey across South East. Generated illustration, not a named site.

Solar PV for commercial property across Hampshire

What a flat roof in Fareham generates

Modelled irradiation here is 1,262 kWh per square metre a year on a low-tilt array, which works out at 980 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 11 percent above the mean across the towns we cover.

Commercial stock in Fareham

Fareham has 720 office premises and 680 shops and other retail premises on the non-domestic rating list, according to the Valuation Office Agency. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits in the bottom quarter of the 318 districts in England and Wales.

40 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 63,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 120 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 42,625 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across PO postcodes, PO14 outward.

FIG. 1 What a Fareham roof makes, month by month

What a Fareham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 27 kWh per kWpJanFeb: 43 kWh per kWpFebMar: 80 kWh per kWpMarApr: 114 kWh per kWpAprMay: 130 kWh per kWpMayJun: 137 kWh per kWpJun137 kWh Jul: 136 kWh per kWpJulAug: 114 kWh per kWpAugSep: 88 kWh per kWpSepOct: 55 kWh per kWpOctNov: 33 kWh per kWpNovDec: 24 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 210 kWp array here models at about 206,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan275,670
Feb439,030
Mar8016,800
Apr11423,940
May13027,300
Jun13728,770
Jul13628,560
Aug11423,940
Sep8818,480
Oct5511,550
Nov336,930
Dec245,040
Source: EU PVGIS v5.2
FIG. 2 Fareham against the rest of Hampshire
  • Portsmouth987
  • Fareham980
  • Southampton950
  • Eastleigh942
  • Winchester917
  • Andover915
  • Basingstoke906
  • Fleet904
  • Farnborough903

Fareham ranks 2 of 10 towns we cover in Hampshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 987, a spread of 84 kWh per kWp. On a 210 kWp commercial roof that is about 17,640 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

All solar on record near PO14

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Newlands Farm Solar Sunsave 10 (FAREHAM) / Vogt Solar 20.5 MW Ground Operational

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks operates the distribution network across Hampshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Hampshire the planning database records 237 solar schemes totalling 1634 MW, of which 51 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Fareham

Is there enough sun in Fareham for a commercial roof array?
Modelled at 980 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 206,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Fareham office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Fareham for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Fareham?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Fareham have capacity for export?
Scottish and Southern Electricity Networks is the distribution network operator for Hampshire. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.