Commercial building solar panels in Hinckley

A flat commercial roof in Hinckley is usually the largest surface a building owns and the one nobody is asked to manage. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.

870 kWh per kWp a year at this latitude, so a 210 kWp array models at about 183,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Hinckley
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Hinckley commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 183,000 kWh/yr
Scale 1:400 / Rev A / LE10

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

50,725
people in the Hinckley built-up area (ONS Census 2021)
490
office properties on the rating list in Hinckley and Bosworth (VOA, March 2025)
730
retail properties, 20 of them large-format (VOA, March 2025)
1
named commercial rooftop scheme on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Midlands town, a supermarket and low offices with rooftop solar
Commercial stock of the kind we survey across East Midlands. Generated illustration, not a named site.

Solar PV for commercial property across Leicestershire

What a flat roof in Hinckley generates

Modelled irradiation here is 1,112 kWh per square metre a year on a low-tilt array, which works out at 870 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

Commercial stock in Hinckley and Bosworth

Hinckley and Bosworth has 490 office premises and 730 shops and other retail premises on the non-domestic rating list, according to the Valuation Office Agency. By office stock the district sits in the bottom quarter of the 318 districts in England and Wales; by retail stock it sits in the bottom quarter of the 318 districts in England and Wales.

The big roofs are in the 20 large-format retail units, superstores and retail warehouses in the district, about 17,000 square metres of floorspace under largely single storey roofs.

The same list carries 160 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

Commercial rooftop solar already planned near Hinckley

The Renewable Energy Planning Database records one roof-mounted scheme on supermarket and retail buildings in this postcode district. These are other organisations' projects, listed from the public record, not ours.

Scheme Applicant Type Capacity Status
Morrison Supermarkets, Cloverfield Morrisons retail 0.44 MW Awaiting Construction

The built-up area holds about 50,725 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

We arrange surveys across the LE postcode area, starting from LE10.

FIG. 1 What a Hinckley roof makes, month by month

What a Hinckley roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 71 kWh per kWpMarApr: 101 kWh per kWpAprMay: 118 kWh per kWpMayJun: 119 kWh per kWpJunJul: 122 kWh per kWpJul122 kWh Aug: 103 kWh per kWpAugSep: 80 kWh per kWpSepOct: 49 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 210 kWp array here models at about 183,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan234,830
Feb377,770
Mar7114,910
Apr10121,210
May11824,780
Jun11924,990
Jul12225,620
Aug10321,630
Sep8016,800
Oct4910,290
Nov285,880
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Hinckley against the rest of Leicestershire
  • Market Harborough891
  • Melton Mowbray879
  • Wigston877
  • Leicester874
  • Hinckley870
  • Loughborough868
  • Coalville863

Hinckley ranks 5 of 7 towns we cover in Leicestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 863 to 891, a spread of 28 kWh per kWp. Within Leicestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Leicestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Leicestershire the planning database records 165 solar schemes totalling 1259 MW, of which 37 are operational (REPD Q1 2026).

All solar on record near LE10

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Elms Farm - Hinckley Solar Farm & Battery Storage Low Carbon UK Solar Investment Co Limited 49.9 MW Ground Awaiting Construction
Lychgate Lane, Aston Flamville - Solar Farm Elgin Energy ES Co Limited 20 MW Ground Awaiting Construction
Morrison Supermarkets, Cloverfield - Solar Panels Morrisons 0.44 MW Roof Awaiting Construction
Burbage House - Solar Array Burbage Farms Limited 0.3 MW Roof Awaiting Construction
E M E B Sports & Social Club, Nutts Lane - Solar Array Hammonds Furniture Limited 0.3 MW Ground Awaiting Construction
Triumph Motorcycles, Normandy Way - Solar PV Array Triumph Motorcycles Limited 1.3 MW Ground Awaiting Construction
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Hinckley

What would a 210 kWp array produce in Hinckley?
Yes. At 870 kWh per kWp a year, a 210 kWp array on a Hinckley roof models at around 183,000 kWh. What changes the answer is how much of that the building uses during opening hours rather than exports. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in Hinckley and Bosworth?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Hinckley and Bosworth for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Hinckley landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Which network operator handles the connection in Hinckley?
Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.