Commercial building solar panels in Sleaford

For a landlord in Sleaford, a roof array is increasingly a question about the EPC rating as much as the electricity bill. Each survey records the usable area once edge strips, plant and walkways are taken out, the load the deck can take, and whether the lease lets the occupier alter the roof.

898 kWh per kWp a year at this latitude, so a 210 kWp array models at about 189,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Sleaford
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Sleaford commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 189,000 kWh/yr
Scale 1:400 / Rev A / NG34

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

18,030
people in the Sleaford built-up area (ONS Census 2021)
570
office properties on the rating list in North Kesteven (VOA, March 2025)
560
retail properties, 10 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Midlands town, a supermarket and low offices with rooftop solar
Commercial stock of the kind we survey across East Midlands. Generated illustration, not a named site.

Solar for offices and retail across Lincolnshire

How much sun a Sleaford roof gets

Modelled irradiation here is 1,145 kWh per square metre a year on a low-tilt array, which works out at 898 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

The rating list for North Kesteven

The Valuation Office Agency's rating list puts 570 office and 560 retail properties in North Kesteven, covering about 69,000 and 66,000 square metres of floorspace respectively. By office stock the district sits in the bottom quarter of the 318 districts in England and Wales; by retail stock it sits in the bottom quarter of the 318 districts in England and Wales.

10 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 7,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 220 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 18,030 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across NG postcodes, NG34 outward.

FIG. 1 What a Sleaford roof makes, month by month

What a Sleaford roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 74 kWh per kWpMarApr: 104 kWh per kWpAprMay: 123 kWh per kWpMayJun: 121 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 107 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.2 times what Dec does on the same roof. A 210 kWp array here models at about 189,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan245,040
Feb387,980
Mar7415,540
Apr10421,840
May12325,830
Jun12125,410
Jul12426,040
Aug10722,470
Sep8317,430
Oct5110,710
Nov306,300
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Sleaford against the rest of Lincolnshire
  • Boston906
  • Spalding902
  • Sleaford898
  • Stamford896
  • Skegness894
  • Grantham886
  • Lincoln882
  • Gainsborough861

Sleaford ranks 3 of 8 towns we cover in Lincolnshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 861 to 906, a spread of 45 kWh per kWp. On a 210 kWp commercial roof that is about 9,450 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

All solar on record near NG34

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
White Cross Lane Nextpower SPV 5 Limited 25 MW Ground Under Construction
Gorse Lane Elgin Energy Esco 20 MW Ground Under Construction
Little Hale Fen - Solar Farm AGR Solar 2 Limited 49.99 MW Ground Awaiting Construction
Washdyke Farm, Billingborough Road - Solar farm GS Ignis Limited 27 MW Ground Awaiting Construction
Beacon Fen Energy Park Low Carbon Limited 400 MW Ground Application Submitted
Mareham Lane, Solar PV Panels Lighthouse Development Consulting 49.99 MW Ground Awaiting Construction

Grid connection through National Grid Electricity Distribution

Connections around Sleaford are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.

Across Lincolnshire the planning database records 226 solar schemes totalling 7052 MW, of which 37 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Sleaford

Is there enough sun in Sleaford for a commercial roof array?
Modelled at 898 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 189,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Sleaford office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to North Kesteven for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Sleaford?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Sleaford have capacity for export?
National Grid Electricity Distribution is the distribution network operator for Lincolnshire. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.