solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Caerleon

Commercial roofs in Caerleon tend to be flat, membrane covered and cluttered with plant, which shapes the layout more than the size does. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.

905 kWh per kWp a year at this latitude, so a 210 kWp array models at about 190,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Caerleon
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Caerleon commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 190,000 kWh/yr
Scale 1:400 / Rev A / Newport

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

920
office properties on the rating list in Newport (VOA, March 2025)
1,340
retail properties, 100 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Aerial view of an out-of-town retail park where some of the large unit roofs carry solar arrays and others are bare
Commercial stock of the kind we survey across Newport. Generated illustration, not a named site.

Commercial rooftop solar across Newport

Yield on a Caerleon commercial roof

Modelled irradiation here is 1,162 kWh per square metre a year on a low-tilt array, which works out at 905 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

How many commercial buildings Newport has

On the Valuation Office Agency's count, Newport holds 1,340 retail and 920 office properties on the rating list. By office stock the district sits above the median of the 318 districts in England and Wales; by retail stock it sits above the median of the 318 districts in England and Wales.

The big roofs are in the 100 large-format retail units, superstores and retail warehouses in the district, about 190,000 square metres of floorspace under largely single storey roofs.

The same list carries 210 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

FIG. 1 What a Caerleon roof makes, month by month

What a Caerleon roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 105 kWh per kWpAprMay: 124 kWh per kWpMayJun: 127 kWh per kWpJun127 kWh Jul: 126 kWh per kWpJulAug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 20 kWh per kWpDec

Jun produces 6.3 times what Dec does on the same roof. A 210 kWp array here models at about 190,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan245,040
Feb398,190
Mar7315,330
Apr10522,050
May12426,040
Jun12726,670
Jul12626,460
Aug10522,050
Sep8317,430
Oct5010,500
Nov296,090
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Caerleon against the rest of Newport
  • Maindee910
  • Caerleon905
  • Cwmbrân903
  • Pontypool887

Caerleon ranks 2 of 4 towns we cover in Newport on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 887 to 910, a spread of 23 kWh per kWp. Within Newport that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Caerleon

How much would solar on a commercial building in Caerleon generate?
The model gives 905 kWh for every kWp installed here, so 210 kWp is about 190,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in Newport?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Newport for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Caerleon landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.