solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Attleborough

For a landlord in Attleborough, a roof array is increasingly a question about the EPC rating as much as the electricity bill. The survey starts with the membrane and the deck: how many years the covering has left, what the roof can carry in ballast, and where plant and its shade rule panels out.

906 kWh per kWp a year at this latitude, so a 210 kWp array models at about 190,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Attleborough
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Attleborough commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 190,000 kWh/yr
Scale 1:400 / Rev A / NR17

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

11,235
people in the Attleborough built-up area (ONS Census 2021)
520
office properties on the rating list in Breckland (VOA, March 2025)
900
retail properties, 40 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Offices and a retail park on the edge of a town in the east of England, several roofs carrying solar
Commercial stock of the kind we survey across East of England. Generated illustration, not a named site.

Solar for offices and retail across Norfolk

How much sun a Attleborough roof gets

Modelled irradiation here is 1,160 kWh per square metre a year on a low-tilt array, which works out at 906 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

The rating list for Breckland

The Valuation Office Agency's rating list puts 520 office and 900 retail properties in Breckland, covering about 48,000 and 192,000 square metres of floorspace respectively. By office stock the district sits in the bottom quarter of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.

40 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 79,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 280 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 11,235 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across NR postcodes, NR17 outward.

FIG. 1 What a Attleborough roof makes, month by month

What a Attleborough roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 107 kWh per kWpAprMay: 123 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 108 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 30 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.3 times what Dec does on the same roof. A 210 kWp array here models at about 190,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan245,040
Feb387,980
Mar7315,330
Apr10722,470
May12325,830
Jun12426,040
Jul12526,250
Aug10822,680
Sep8317,430
Oct5210,920
Nov306,300
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Attleborough against the rest of Norfolk
  • Cromer923
  • Great Yarmouth920
  • Wymondham906
  • Attleborough906
  • Norwich904
  • Dereham898
  • King's Lynn897
  • Thetford897

Attleborough ranks 4 of 8 towns we cover in Norfolk on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 897 to 923, a spread of 26 kWh per kWp. Within Norfolk that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

All solar on record near NR17

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Rookery Business Park Solar Century/ Bluefield Solar 5 MW Ground Operational
Attleborough Road Solar Farm Pace Carnival Energy 30 MW Ground Under Construction
Land North of the A11 - Solar Park Private Developer 1 MW Ground Awaiting Construction
Lays Farm, Wood Lane - Solar Panels Copperfield Enterprises Limited 0.23 MW Roof Awaiting Construction
Hargham Road - Solar Panels Hargham Farms & Partners 0.25 MW Ground Application Submitted

Grid connection through UK Power Networks

Connections around Attleborough are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.

Across Norfolk the planning database records 179 solar schemes totalling 1490 MW, of which 43 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Attleborough

Is there enough sun in Attleborough for a commercial roof array?
Modelled at 906 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 190,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Attleborough office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Breckland for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Attleborough?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Attleborough have capacity for export?
UK Power Networks is the distribution network operator for Norfolk. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.

Nearby

All Norfolk locations