solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Daventry

An office or store in Daventry buys most of its electricity between eight in the morning and six at night, which is when a roof array generates. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.

890 kWh per kWp a year at this latitude, so a 210 kWp array models at about 187,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Daventry
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Daventry commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 187,000 kWh/yr
Scale 1:400 / Rev A / NN11

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

27,790
people in the Daventry built-up area (ONS Census 2021)
2,620
office properties on the rating list in West Northamptonshire (VOA, March 2025)
2,320
retail properties, 110 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Midlands town, a supermarket and low offices with rooftop solar
Commercial stock of the kind we survey across East Midlands. Generated illustration, not a named site.

Solar for offices and retail across Northamptonshire

How much sun a Daventry roof gets

Modelled irradiation here is 1,137 kWh per square metre a year on a low-tilt array, which works out at 890 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

The rating list for West Northamptonshire

The Valuation Office Agency's rating list puts 2,620 office and 2,320 retail properties in West Northamptonshire, covering about 481,000 and 509,000 square metres of floorspace respectively. By office stock the district sits in the top tenth of the 318 districts in England and Wales; by retail stock it sits in the top quarter of the 318 districts in England and Wales.

The big roofs are in the 110 large-format retail units, superstores and retail warehouses in the district, about 229,000 square metres of floorspace under largely single storey roofs.

The same list carries 690 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 27,790 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

We arrange surveys across the NN postcode area, starting from NN11.

FIG. 1 What a Daventry roof makes, month by month

What a Daventry roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 103 kWh per kWpAprMay: 119 kWh per kWpMayJun: 122 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 105 kWh per kWpAugSep: 82 kWh per kWpSepOct: 51 kWh per kWpOctNov: 29 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.2 times what Dec does on the same roof. A 210 kWp array here models at about 187,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan245,040
Feb387,980
Mar7315,330
Apr10321,630
May11924,990
Jun12225,620
Jul12426,040
Aug10522,050
Sep8217,220
Oct5110,710
Nov296,090
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Daventry against the rest of Northamptonshire
  • Rushden900
  • Towcester897
  • Wellingborough896
  • Kettering895
  • Northampton893
  • Corby892
  • Daventry890

Daventry ranks 7 of 7 towns we cover in Northamptonshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 890 to 900, a spread of 10 kWh per kWp. Within Northamptonshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Northamptonshire the planning database records 133 solar schemes totalling 1932 MW, of which 25 are operational (REPD Q1 2026).

All solar on record near NN11

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Ford Motor Company Limited - Solar Farm Onsite Energy Projects Limited 1 MW Ground Awaiting Construction
Royal Oak Way South - Solar Array Cummins Limited 1.66 MW Ground Operational
Fawsley Estate, Fawsley - Solar Arrays Elgin Energy EsCo 12 MW Ground Awaiting Construction
Danetre and Southbrook Learning Village, Hawke Road - Solar PV Panels E-Act 0.18 MW Ground Awaiting Construction
School House, Ashby Road - Solar PV Panels E-ACT 0.21 MW Roof Awaiting Construction
Priors Marston Road, Hellidon - Solar Panels Interesting Hotels Limited 0.32 MW Ground Awaiting Construction
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Daventry

How much would solar on a commercial building in Daventry generate?
The model gives 890 kWh for every kWp installed here, so 210 kWp is about 187,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in West Northamptonshire?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to West Northamptonshire for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Daventry landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Which network operator handles the connection in Daventry?
Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.

Nearby

All Northamptonshire locations