solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Newcastle-under-Lyme

Commercial roofs in Newcastle-under-Lyme tend to be flat, membrane covered and cluttered with plant, which shapes the layout more than the size does. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.

826 kWh per kWp a year at this latitude, so a 210 kWp array models at about 173,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newcastle-under-Lyme
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Newcastle-under-Lyme commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 173,000 kWh/yr
Scale 1:400 / Rev A / ST5

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

76,505
people in the Newcastle-under-Lyme built-up area (ONS Census 2021)
690
office properties on the rating list in Newcastle-under-Lyme (VOA, March 2025)
950
retail properties, 30 of them large-format (VOA, March 2025)
1
named commercial rooftop scheme on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Midlands town, a supermarket and low offices with rooftop solar
Commercial stock of the kind we survey across West Midlands. Generated illustration, not a named site.

Commercial rooftop solar across Staffordshire

Yield on a Newcastle-under-Lyme commercial roof

Modelled irradiation here is 1,056 kWh per square metre a year on a low-tilt array, which works out at 826 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here rests more on daytime consumption than on raw generation.

How many commercial buildings Newcastle-under-Lyme has

On the Valuation Office Agency's count, Newcastle-under-Lyme holds 950 retail and 690 office properties on the rating list. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.

The big roofs are in the 30 large-format retail units, superstores and retail warehouses in the district, about 59,000 square metres of floorspace under largely single storey roofs.

The same list carries 160 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

Commercial rooftop solar already planned near Newcastle-under-Lyme

The Renewable Energy Planning Database records one roof-mounted scheme on public sector buildings in this postcode district. These are other organisations' projects, listed from the public record, not ours.

Scheme Applicant Type Capacity Status
Bradwell Hospital,Talke Road Midlands Partnership Foundation Trust civic n/a Awaiting Construction

The built-up area holds about 76,505 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

We arrange surveys across the ST postcode area, starting from ST5.

FIG. 1 What a Newcastle-under-Lyme roof makes, month by month

What a Newcastle-under-Lyme roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 98 kWh per kWpAprMay: 115 kWh per kWpMay115 kWh Jun: 115 kWh per kWpJunJul: 115 kWh per kWpJulAug: 98 kWh per kWpAugSep: 76 kWh per kWpSepOct: 45 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.4 times what Dec does on the same roof. A 210 kWp array here models at about 173,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan193,990
Feb357,350
Mar6714,070
Apr9820,580
May11524,150
Jun11524,150
Jul11524,150
Aug9820,580
Sep7615,960
Oct459,450
Nov265,460
Dec183,780
Source: EU PVGIS v5.2
FIG. 2 Newcastle-under-Lyme against the rest of Staffordshire
  • Tamworth857
  • Lichfield857
  • Burton upon Trent852
  • Stafford842
  • Cannock842
  • Stoke-on-Trent833
  • Newcastle-under-Lyme826

Newcastle-under-Lyme ranks 7 of 7 towns we cover in Staffordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 826 to 857, a spread of 31 kWh per kWp. Within Staffordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Staffordshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Staffordshire the planning database records 118 solar schemes totalling 1054 MW, of which 17 are operational (REPD Q1 2026).

All solar on record near ST5

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Keele University Keele University 4.4 MW Ground Operational
Bradwell Hall Nursing Home, Old Hall Drive - Solar Panels Bradwell Nursing Home Limited 0.24 MW Roof Awaiting Construction
Tree Of Life, Coaldale Road - Solar Panels Columbia Threadneedle 0.5 MW Roof Awaiting Construction
The 4 Candles, High Street - Solar Panel DCMS n/a Roof Awaiting Construction
Forfarmers, Speedwell Road- Solar Panels ForFarmers 0.33 MW Roof Awaiting Construction
Bradwell Hospital,Talke Road - Solar Panels Midlands Partnership Foundation Trust n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newcastle-under-Lyme

What would a 210 kWp array produce in Newcastle-under-Lyme?
Yes. At 826 kWh per kWp a year, a 210 kWp array on a Newcastle-under-Lyme roof models at around 173,000 kWh. What changes the answer is how much of that the building uses during opening hours rather than exports. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in Newcastle-under-Lyme?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Newcastle-under-Lyme for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Newcastle-under-Lyme landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Which network operator handles the connection in Newcastle-under-Lyme?
Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.

Nearby