solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Haywards Heath

For a landlord in Haywards Heath, a roof array is increasingly a question about the EPC rating as much as the electricity bill. The survey starts with the membrane and the deck: how many years the covering has left, what the roof can carry in ballast, and where plant and its shade rule panels out.

957 kWh per kWp a year at this latitude, so a 210 kWp array models at about 201,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Haywards Heath
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Haywards Heath commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 201,000 kWh/yr
Scale 1:400 / Rev A / RH16

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

40,185
people in the Haywards Heath built-up area (ONS Census 2021)
950
office properties on the rating list in Mid Sussex (VOA, March 2025)
1,010
retail properties, 30 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Home Counties town, offices and a retail park with solar on several roofs
Commercial stock of the kind we survey across South East. Generated illustration, not a named site.

Solar for offices and retail across Sussex

How much sun a Haywards Heath roof gets

Modelled irradiation here is 1,230 kWh per square metre a year on a low-tilt array, which works out at 957 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 8 percent above the mean across the towns we cover.

The rating list for Mid Sussex

The Valuation Office Agency's rating list puts 950 office and 1,010 retail properties in Mid Sussex, covering about 143,000 and 178,000 square metres of floorspace respectively. By office stock the district sits above the median of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.

30 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 64,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 270 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 40,185 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across RH postcodes, RH16 outward.

FIG. 1 What a Haywards Heath roof makes, month by month

What a Haywards Heath roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 77 kWh per kWpMarApr: 112 kWh per kWpAprMay: 126 kWh per kWpMayJun: 135 kWh per kWpJun135 kWh Jul: 134 kWh per kWpJulAug: 112 kWh per kWpAugSep: 86 kWh per kWpSepOct: 53 kWh per kWpOctNov: 32 kWh per kWpNovDec: 23 kWh per kWpDec

Jun produces 5.9 times what Dec does on the same roof. A 210 kWp array here models at about 201,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan265,460
Feb418,610
Mar7716,170
Apr11223,520
May12626,460
Jun13528,350
Jul13428,140
Aug11223,520
Sep8618,060
Oct5311,130
Nov326,720
Dec234,830
Source: EU PVGIS v5.2
FIG. 2 Haywards Heath against the rest of Sussex
  • Lewes1028
  • Eastbourne1017
  • Brighton1015
  • Bognor Regis1000
  • Worthing999
  • Hastings989
  • Haywards Heath957
  • Horsham935
  • Crawley915

Haywards Heath ranks 8 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 210 kWp commercial roof that is about 23,730 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Haywards Heath

How much would solar on a commercial building in Haywards Heath generate?
The model gives 957 kWh for every kWp installed here, so 210 kWp is about 201,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Haywards Heath office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Mid Sussex for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Haywards Heath?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.

Nearby

All Sussex locations