Commercial building solar panels across Tyne and Wear
We arrange roof surveys on offices, retail units, hotels and leisure buildings throughout Tyne and Wear, model what each roof can carry against the building's own consumption, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 831 kWh/kWp/yr
- Mean across Tyne and Wear towns, EU PVGIS v5.2
- Network operator
- Northern Powergrid
- G99 applications and export limits
- Commercial stock
- 5,020 office / 7,150 retail
- VOA rating list, March 2025
- Commercial rooftop schemes
- 0 on record
- REPD Q1 2026, districts we cover
- Towns covered
- 5
- Surveys arranged county wide
What the data says about Tyne and Wear
Modelled yield varies across Tyne and Wear: Sunderland comes out at 849 kWh per kWp a year against 806 at Newcastle. On a 210 kWp commercial roof that gap is about 9,030 kWh a year.
Across the 4 authorities our Tyne and Wear towns sit in, the Valuation Office Agency lists 5,020 office and 7,150 retail properties, 280 of them large-format stores and retail warehouses. Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
The planning database records no roof-mounted commercial schemes in the districts we cover in Tyne and Wear. That usually means arrays have gone in below its reporting threshold, not that none exist: many commercial roofs carry less than a megawatt and never appear.
Connections across the county run through Northern Powergrid. Anything above 3.68 kW per phase needs a G99 application, and the export limit offered shapes the design, so the question is asked before the array is sized.
- Sunderland 849 kWh/kWp
- Gateshead 822 kWh/kWp
- South Shields 849 kWh/kWp
- Washington 828 kWh/kWp
- Newcastle 806 kWh/kWp
- North Shields 833 kWh/kWp
Book a survey in Tyne and Wear
Send the postcode, the rough footprint and whether you own or lease the building. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.