Commercial building solar panels in Nuneaton
For a landlord in Nuneaton, a roof array is increasingly a question about the EPC rating as much as the electricity bill. The survey starts with the membrane and the deck: how many years the covering has left, what the roof can carry in ballast, and where plant and its shade rule panels out.
866 kWh per kWp a year at this latitude, so a 210 kWp array models at about 182,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in NuneatonIllustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.
- 88,815
- people in the Nuneaton built-up area (ONS Census 2021)
- 350
- office properties on the rating list in Nuneaton and Bedworth (VOA, March 2025)
- 900
- retail properties, 40 of them large-format (VOA, March 2025)
- 0
- named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Solar for offices and retail across Warwickshire
How much sun a Nuneaton roof gets
Modelled irradiation here is 1,107 kWh per square metre a year on a low-tilt array, which works out at 866 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.
The rating list for Nuneaton and Bedworth
The Valuation Office Agency's rating list puts 350 office and 900 retail properties in Nuneaton and Bedworth, covering about 63,000 and 144,000 square metres of floorspace respectively. By office stock the district sits in the bottom quarter of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.
40 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 31,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.
The same list carries 130 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.
Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
The built-up area holds about 88,815 people, large enough for a retail park or two and a cluster of office buildings (ONS Census 2021 built-up areas).
Surveys run across CV postcodes, CV11 outward.
Nuneaton ranks 6 of 7 towns we cover in Warwickshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 893, a spread of 27 kWh per kWp. Within Warwickshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
All solar on record near CV11
Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| North Warwickshire College, Hinckley Road - Solar Panel | North Warwickshire South Leicestershire College | 0.29 MW | Roof | Awaiting Construction |
| George eliot high school, Raveloe Drive - Solar Panels | George Eliot Academy | 0.29 MW | Roof | Awaiting Construction |
Grid connection through National Grid Electricity Distribution
National Grid Electricity Distribution operates the distribution network across Warwickshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Warwickshire the planning database records 94 solar schemes totalling 1201 MW, of which 18 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Nuneaton
- How much would solar on a commercial building in Nuneaton generate?
- The model gives 866 kWh for every kWp installed here, so 210 kWp is about 182,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Is planning permission needed for panels on a Nuneaton office or shop?
- Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Nuneaton and Bedworth for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
- Will rooftop solar improve the EPC rating of a let building in Nuneaton?
- It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
- Does the grid around Nuneaton have capacity for export?
- National Grid Electricity Distribution is the distribution network operator for Warwickshire. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.