Commercial building solar panels in Devizes

Most commercial roofs around Devizes already carry plant, a parapet and an access hatch, and the space between them is where the array goes. Each survey records the usable area once edge strips, plant and walkways are taken out, the load the deck can take, and whether the lease lets the occupier alter the roof.

906 kWh per kWp a year at this latitude, so a 210 kWp array models at about 190,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Devizes
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Devizes commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 190,000 kWh/yr
Scale 1:400 / Rev A / SN10

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

19,490
people in the Devizes built-up area (ONS Census 2021)
3,140
office properties on the rating list in Wiltshire (VOA, March 2025)
3,190
retail properties, 150 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a South West market town, with rooftop solar on several buildings
Commercial stock of the kind we survey across South West. Generated illustration, not a named site.

Commercial rooftop solar across Wiltshire

Yield on a Devizes commercial roof

Modelled irradiation here is 1,161 kWh per square metre a year on a low-tilt array, which works out at 906 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

How many commercial buildings Wiltshire has

On the Valuation Office Agency's count, Wiltshire holds 3,190 retail and 3,140 office properties on the rating list. By office stock the district sits in the top tenth of the 318 districts in England and Wales; by retail stock it sits in the top tenth of the 318 districts in England and Wales.

150 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 321,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 860 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 19,490 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

Surveys run across SN postcodes, SN10 outward.

FIG. 1 What a Devizes roof makes, month by month

What a Devizes roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 74 kWh per kWpMarApr: 106 kWh per kWpAprMay: 123 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 210 kWp array here models at about 190,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan255,250
Feb398,190
Mar7415,540
Apr10622,260
May12325,830
Jun12426,040
Jul12526,250
Aug10522,050
Sep8317,430
Oct5110,710
Nov306,300
Dec214,410
Source: EU PVGIS v5.2
FIG. 2 Devizes against the rest of Wiltshire
  • Salisbury923
  • Melksham912
  • Warminster912
  • Trowbridge909
  • Devizes906
  • Marlborough900
  • Swindon899
  • Chippenham894

Devizes ranks 5 of 8 towns we cover in Wiltshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 923, a spread of 29 kWh per kWp. Within Wiltshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

All solar on record near SN10

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Hopton Road Industrial Estate Hopton PV Ltd 1.3 MW Ground Operational
Lower End Farm Good Energy Generation 4.9 MW Ground Operational
Lodge Farm (Poulshot) Hive Energy 14.5 MW Ground Operational
HM Erlestoke Solar Array Ministry of Justice 0.21 MW Ground Application Submitted
Blounts Court Farm, Potterne - Solar Panels Greenfield Energy Developments Limited 15 MW Ground Application Refused
Potterne Park Farm, Potterne - Solar Farm Potterne Solar Project Limited 49.9 MW Ground Application Refused

Grid connection through Scottish and Southern Electricity Networks

Connections around Devizes are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.

Across Wiltshire the planning database records 159 solar schemes totalling 1585 MW, of which 56 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Devizes

Is there enough sun in Devizes for a commercial roof array?
Modelled at 906 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 190,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Devizes office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Wiltshire for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Devizes?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Devizes have capacity for export?
Scottish and Southern Electricity Networks is the distribution network operator for Wiltshire. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.