Commercial building solar panels in Evesham
An office or store in Evesham buys most of its electricity between eight in the morning and six at night, which is when a roof array generates. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.
876 kWh per kWp a year at this latitude, so a 210 kWp array models at about 184,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in EveshamIllustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.
- 28,250
- people in the Evesham built-up area (ONS Census 2021)
- 880
- office properties on the rating list in Wychavon (VOA, March 2025)
- 920
- retail properties, 40 of them large-format (VOA, March 2025)
- 0
- named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Solar for offices and retail across Worcestershire
How much sun a Evesham roof gets
Modelled irradiation here is 1,122 kWh per square metre a year on a low-tilt array, which works out at 876 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.
The rating list for Wychavon
The Valuation Office Agency's rating list puts 880 office and 920 retail properties in Wychavon, covering about 80,000 and 171,000 square metres of floorspace respectively. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.
The big roofs are in the 40 large-format retail units, superstores and retail warehouses in the district, about 65,000 square metres of floorspace under largely single storey roofs.
The same list carries 290 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.
Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
The built-up area holds about 28,250 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).
We arrange surveys across the WR postcode area, starting from WR11.
Evesham ranks 4 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
Connections around Evesham are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.
Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).
All solar on record near WR11
Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Salford Lodge | AR Partners | 5 MW | Ground | Operational |
| Cleeve Road | Kanes Foods | 3.7 MW | Ground | Planning Permission Expired |
| Sytchwythy Fields | AR Partners | 1.4 MW | Ground | Operational |
| Plant Produce - Solar PV panels | Applevale Limited | 0.15 MW | Ground | Operational |
| Littleton Solar Farm | Stark Energy / SSE Renewables | 30 MW | Ground | Operational |
| Primafruit Limited - Solar Panels | Fresca Group Limited | n/a | Roof | Awaiting Construction |
Send us the postcode
Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Evesham
- Is there enough sun in Evesham for a commercial roof array?
- Modelled at 876 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 184,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission for solar on a commercial building in Wychavon?
- Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Wychavon for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
- Does solar help a Evesham landlord meet MEES?
- It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
- Which network operator handles the connection in Evesham?
- Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.