Commercial building solar panels in Evesham

An office or store in Evesham buys most of its electricity between eight in the morning and six at night, which is when a roof array generates. What decides a scheme is the roof covering, the parapet height and the plant layout, which is why the survey happens on the roof rather than from a satellite image.

876 kWh per kWp a year at this latitude, so a 210 kWp array models at about 184,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Evesham
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Evesham commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 184,000 kWh/yr
Scale 1:400 / Rev A / WR11

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

28,250
people in the Evesham built-up area (ONS Census 2021)
880
office properties on the rating list in Wychavon (VOA, March 2025)
920
retail properties, 40 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a Midlands town, a supermarket and low offices with rooftop solar
Commercial stock of the kind we survey across West Midlands. Generated illustration, not a named site.

Solar for offices and retail across Worcestershire

How much sun a Evesham roof gets

Modelled irradiation here is 1,122 kWh per square metre a year on a low-tilt array, which works out at 876 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is within a few percent of the mean across the towns we cover, so the weather is not what decides the case here. Opening hours are.

The rating list for Wychavon

The Valuation Office Agency's rating list puts 880 office and 920 retail properties in Wychavon, covering about 80,000 and 171,000 square metres of floorspace respectively. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits below the median of the 318 districts in England and Wales.

The big roofs are in the 40 large-format retail units, superstores and retail warehouses in the district, about 65,000 square metres of floorspace under largely single storey roofs.

The same list carries 290 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 28,250 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

We arrange surveys across the WR postcode area, starting from WR11.

FIG. 1 What a Evesham roof makes, month by month

What a Evesham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 72 kWh per kWpMarApr: 102 kWh per kWpAprMay: 119 kWh per kWpMayJun: 121 kWh per kWpJunJul: 122 kWh per kWpJul122 kWh Aug: 103 kWh per kWpAugSep: 80 kWh per kWpSepOct: 49 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 210 kWp array here models at about 184,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan234,830
Feb387,980
Mar7215,120
Apr10221,420
May11924,990
Jun12125,410
Jul12225,620
Aug10321,630
Sep8016,800
Oct4910,290
Nov285,880
Dec204,200
Source: EU PVGIS v5.2
FIG. 2 Evesham against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Evesham ranks 4 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

Connections around Evesham are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

All solar on record near WR11

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Salford Lodge AR Partners 5 MW Ground Operational
Cleeve Road Kanes Foods 3.7 MW Ground Planning Permission Expired
Sytchwythy Fields AR Partners 1.4 MW Ground Operational
Plant Produce - Solar PV panels Applevale Limited 0.15 MW Ground Operational
Littleton Solar Farm Stark Energy / SSE Renewables 30 MW Ground Operational
Primafruit Limited - Solar Panels Fresca Group Limited n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Evesham

Is there enough sun in Evesham for a commercial roof array?
Modelled at 876 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 184,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in Wychavon?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Wychavon for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Evesham landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Which network operator handles the connection in Evesham?
Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.