Commercial building solar panels in Torquay

Commercial roofs in Torquay tend to be flat, membrane covered and cluttered with plant, which shapes the layout more than the size does. We check the covering and the lease together, because a roof with eight years of membrane left and a tenant with a break in three changes the answer.

937 kWh per kWp a year at this latitude, so a 210 kWp array models at about 197,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Torquay
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Torquay commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 197,000 kWh/yr
Scale 1:400 / Rev A / TQ2

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

52,035
people in the Torquay built-up area (ONS Census 2021)
530
office properties on the rating list in Torbay (VOA, March 2025)
1,690
retail properties, 50 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
The commercial edge of a South West market town, with rooftop solar on several buildings
Commercial stock of the kind we survey across South West. Generated illustration, not a named site.

Commercial rooftop solar across Devon

Yield on a Torquay commercial roof

Modelled irradiation here is 1,191 kWh per square metre a year on a low-tilt array, which works out at 937 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the towns we cover.

How many commercial buildings Torbay has

On the Valuation Office Agency's count, Torbay holds 1,690 retail and 530 office properties on the rating list. By office stock the district sits in the bottom quarter of the 318 districts in England and Wales; by retail stock it sits above the median of the 318 districts in England and Wales.

The big roofs are in the 50 large-format retail units, superstores and retail warehouses in the district, about 81,000 square metres of floorspace under largely single storey roofs.

The same list carries 340 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

The built-up area holds about 52,035 people, so the stock here runs to high street premises, a supermarket or two and the odd hotel (ONS Census 2021 built-up areas).

We arrange surveys across the TQ postcode area, starting from TQ2.

FIG. 1 What a Torquay roof makes, month by month

What a Torquay roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 75 kWh per kWpMarApr: 109 kWh per kWpAprMay: 128 kWh per kWpMayJun: 131 kWh per kWpJun131 kWh Jul: 130 kWh per kWpJulAug: 110 kWh per kWpAugSep: 85 kWh per kWpSepOct: 52 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jun produces 6.2 times what Dec does on the same roof. A 210 kWp array here models at about 197,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan255,250
Feb398,190
Mar7515,750
Apr10922,890
May12826,880
Jun13127,510
Jul13027,300
Aug11023,100
Sep8517,850
Oct5210,920
Nov306,300
Dec214,410
Source: EU PVGIS v5.2
FIG. 2 Torquay against the rest of Devon
  • Paignton961
  • Plymouth960
  • Newton Abbot943
  • Exeter938
  • Torquay937
  • Exmouth937
  • Barnstaple908
  • Tiverton903

Torquay ranks 5 of 8 towns we cover in Devon on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 961, a spread of 58 kWh per kWp. On a 210 kWp commercial roof that is about 12,180 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Devon, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Devon the planning database records 248 solar schemes totalling 1451 MW, of which 90 are operational (REPD Q1 2026).

All solar on record near TQ2

Every scheme in this postcode district in the government's Renewable Energy Planning Database, Q1 2026, ground and roof mounted, commercial or not. None of them is ours. Together they are a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Torbay Hospital, Nightingale Park - Solar Panel Array TDA 3.2 MW Ground Awaiting Construction
Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Torquay

What would a 210 kWp array produce in Torquay?
Yes. At 937 kWh per kWp a year, a 210 kWp array on a Torquay roof models at around 197,000 kWh. What changes the answer is how much of that the building uses during opening hours rather than exports. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission for solar on a commercial building in Torbay?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Torbay for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Does solar help a Torquay landlord meet MEES?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Which network operator handles the connection in Torquay?
Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.