Commercial building solar panels in Porthmadog
Commercial roofs in Porthmadog tend to be flat, membrane covered and cluttered with plant, which shapes the layout more than the size does. We check the covering and the lease together, because a roof with eight years of membrane left and a tenant with a break in three changes the answer.
820 kWh per kWp a year at this latitude, so a 210 kWp array models at about 172,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in PorthmadogIllustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.
- 790
- office properties on the rating list in Gwynedd (VOA, March 2025)
- 1,610
- retail properties, 40 of them large-format (VOA, March 2025)
- 0
- named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Commercial rooftop solar across Gwynedd
Yield on a Porthmadog commercial roof
Modelled irradiation here is 1,044 kWh per square metre a year on a low-tilt array, which works out at 820 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here rests more on daytime consumption than on raw generation.
How many commercial buildings Gwynedd has
On the Valuation Office Agency's count, Gwynedd holds 1,610 retail and 790 office properties on the rating list. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits above the median of the 318 districts in England and Wales.
The big roofs are in the 40 large-format retail units, superstores and retail warehouses in the district, about 74,000 square metres of floorspace under largely single storey roofs.
The same list carries 500 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.
Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
Porthmadog ranks 2 of 6 towns we cover in Gwynedd on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 704 to 887, a spread of 183 kWh per kWp. On a 210 kWp commercial roof that is about 38,430 kWh a year between the strongest and weakest town in the county.
Grid connection through SP Energy Networks
SP Energy Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Across Gwynedd the planning database records 19 solar schemes totalling 221 MW, of which 6 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Porthmadog
- Is there enough sun in Porthmadog for a commercial roof array?
- Modelled at 820 kWh per kWp a year for a low-tilt array at this latitude, a 210 kWp system comes out at roughly 172,000 kWh a year before shading. It needs about 1,390 m² of flat roof once the edge strip, plant and walkways are kept clear. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission for solar on a commercial building in Gwynedd?
- Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Gwynedd for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
- Does solar help a Porthmadog landlord meet MEES?
- It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
- Which network operator handles the connection in Porthmadog?
- Capacity varies street by street and only SP Energy Networks can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.