Commercial building solar panels in Welshpool
An office or store in Welshpool buys most of its electricity between eight in the morning and six at night, which is when a roof array generates. We check the covering and the lease together, because a roof with eight years of membrane left and a tenant with a break in three changes the answer.
831 kWh per kWp a year at this latitude, so a 210 kWp array models at about 175,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in WelshpoolIllustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.
- 890
- office properties on the rating list in Powys (VOA, March 2025)
- 1,410
- retail properties, 30 of them large-format (VOA, March 2025)
- 0
- named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Solar for offices and retail across Powys
How much sun a Welshpool roof gets
Modelled irradiation here is 1,061 kWh per square metre a year on a low-tilt array, which works out at 831 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 6 percent below the mean across the towns we cover, so the case here rests more on daytime consumption than on raw generation.
The rating list for Powys
The Valuation Office Agency's rating list puts 890 office and 1,410 retail properties in Powys, covering about 93,000 and 219,000 square metres of floorspace respectively. By office stock the district sits below the median of the 318 districts in England and Wales; by retail stock it sits above the median of the 318 districts in England and Wales.
The big roofs are in the 30 large-format retail units, superstores and retail warehouses in the district, about 63,000 square metres of floorspace under largely single storey roofs.
The same list carries 410 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.
Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.
Welshpool ranks 2 of 6 towns we cover in Powys on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 820 to 838, a spread of 18 kWh per kWp. Within Powys that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
Connections around Welshpool are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a commercial building uses most of what the roof makes during the working day.
Across Powys the planning database records 18 solar schemes totalling 39 MW, of which 1 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Welshpool
- What would a 210 kWp array produce in Welshpool?
- Yes. At 831 kWh per kWp a year, a 210 kWp array on a Welshpool roof models at around 175,000 kWh. What changes the answer is how much of that the building uses during opening hours rather than exports. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission for solar on a commercial building in Powys?
- Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Powys for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
- Does solar help a Welshpool landlord meet MEES?
- It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
- Which network operator handles the connection in Welshpool?
- Capacity varies street by street and only National Grid Electricity Distribution can answer it for your connection. We ask early, because an export-limited offer changes the design rather than ending the scheme, and most commercial buildings use most of what they generate anyway.