solarpanelsforcommercialbuildings Offices, retail, hotels and leisure Book a roof survey

Commercial building solar panels in Glastonbury

Most commercial roofs around Glastonbury already carry plant, a parapet and an access hatch, and the space between them is where the array goes. Each survey records the usable area once edge strips, plant and walkways are taken out, the load the deck can take, and whether the lease lets the occupier alter the roof.

913 kWh per kWp a year at this latitude, so a 210 kWp array models at about 192,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Glastonbury
60 m 32 m N plant screen shade, kept clear stair core edge strip 1.5 m phase 1
Drawing Glastonbury commercial roof
Roof 60 x 32 m, 1,920 m²
Array 210 kWp, east-west
Yield 192,000 kWh/yr
Scale 1:400 / Rev A / Somerset

Illustrative layout for a flat commercial roof of this size, with plant, shade and access kept clear. Your own figures come from the roof survey.

2,990
office properties on the rating list in Somerset (VOA, March 2025)
4,410
retail properties, 190 of them large-format (VOA, March 2025)
0
named commercial rooftop schemes on the planning record nearby (REPD, Q1 2026)
Aerial view of an out-of-town retail park where some of the large unit roofs carry solar arrays and others are bare
Commercial stock of the kind we survey across Somerset. Generated illustration, not a named site.

Commercial rooftop solar across Somerset

Yield on a Glastonbury commercial roof

Modelled irradiation here is 1,169 kWh per square metre a year on a low-tilt array, which works out at 913 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 3 percent above the mean across the towns we cover.

How many commercial buildings Somerset has

On the Valuation Office Agency's count, Somerset holds 4,410 retail and 2,990 office properties on the rating list. By office stock the district sits in the top tenth of the 318 districts in England and Wales; by retail stock it sits in the top tenth of the 318 districts in England and Wales.

190 of those retail properties are superstores, large food stores, large shops or retail warehouses, together about 416,000 square metres. Single storey boxes of that size are where most commercial rooftop solar actually gets built, because the roof is big, flat or shallow, and uninterrupted.

The same list carries 1,390 hotel, leisure and assembly properties in the district. Leisure centres and hotels run seven days a week, which puts weekend generation to use that an office would export.

Source: Valuation Office Agency, Non-domestic rating: business floorspace, 31 March 2025 (published December 2025), counts and floorspace by special category code and local authority district, England and Wales.

FIG. 1 What a Glastonbury roof makes, month by month

What a Glastonbury roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 76 kWh per kWpMarApr: 107 kWh per kWpAprMay: 124 kWh per kWpMayJun: 124 kWh per kWpJunJul: 126 kWh per kWpJul126 kWh Aug: 104 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 31 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 210 kWp array here models at about 192,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp210 kWp array
Jan265,460
Feb418,610
Mar7615,960
Apr10722,470
May12426,040
Jun12426,040
Jul12626,460
Aug10421,840
Sep8317,430
Oct5110,710
Nov316,510
Dec214,410
Source: EU PVGIS v5.2
FIG. 2 Glastonbury against the rest of Somerset
  • Weston-super-Mare934
  • Bridgwater931
  • Yeovil923
  • Glastonbury913
  • Taunton911
  • Bath904
  • Wells899
  • Frome894

Glastonbury ranks 4 of 8 towns we cover in Somerset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 934, a spread of 40 kWh per kWp. Within Somerset that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Somerset, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Somerset the planning database records 223 solar schemes totalling 1574 MW, of which 79 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the building is, roughly how big the roof is, and whether you own it or lease it. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Glastonbury

How much would solar on a commercial building in Glastonbury generate?
The model gives 913 kWh for every kWp installed here, so 210 kWp is about 192,000 kWh a year before shading losses. Allow roughly 1,390 m² of roof for it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a Glastonbury office or shop?
Usually not a full application. In England, panels on the roof of a non-domestic building are permitted development under Class J of Part 14 of the General Permitted Development Order, with no capacity cap since December 2023. Above 50 kW, which covers most commercial arrays, you must first apply to Somerset for a determination on prior approval of the design and appearance, in particular glare on neighbouring land. On a flat roof panels may stand no more than 1 metre above the roof and must sit at least 1 metre from its edge, and listed buildings and scheduled monuments are excluded. See our planning permission guide for the detail.
Will rooftop solar improve the EPC rating of a let building in Glastonbury?
It can. A non-domestic EPC is an asset rating, and on-site generation counts in the calculation, so an array usually lifts the score. Let property in England and Wales must be EPC E or better today. The government's interim response of 18 June 2026 proposes EPC B, where cost effective, from 2031 for let buildings over 1,000 m², and drops the EPC C step once planned for 2027. How far solar moves a particular building depends on its fabric and services, which is why the EPC assessor models it before anything is fitted.
Does the grid around Glastonbury have capacity for export?
National Grid Electricity Distribution is the distribution network operator for Somerset. Arrays above 3.68 kW per phase connect under G99, and the application sets the export limit. It is part of the design work we arrange.